CSM 10.2.2 Documentation

Home

Project & Portfolio Management mApp Solution Items

The Items tables provides a list of items included when applying the mApp® Solution and the typical merge action.

Item Category Item Typical Merge Action
Automation Process Definitions Additional Resource Time Entries, Create Project From Demand, Create Resource Time Entries, Delete Resource, Delete Staging table, Delete Task From Project Import, Edit Via Browser, mApp Factory - Link Predecessor, mApp Factory - Link Predecessors 2 & 3, mApp Factory - Link to Parent, Set Baseline Date - Project, Set Task Status to In Progress - Timesheet, Set to Assigned, Submit Via Browser, Update Budgets Overwrite
Business Objects Benefit Item, Budget Item, Cost Entry, Operational Task, Operational Task Status, Operational Task Type, Plans, PPM Action Item, PPM Area, PPM Change Order, PPM Decision, PPM Demand, PPM Focus Area, PPM Health Type, PPM Issue, PPM Portfolio, PPM Predecessor Type, PPM Program, PPM Project, PPM Resource, PPM Resource Plan, PPM Resource Time, PPM Risk, PPM Scheduled PTO, PPM Scope, PPM Stakeholder, PPM Status, PPM Status Group, PPM Strategic Objectives, PPM Timesheet, PPM Type, PredecessorLinksSuccessor, Project Task, Project Task Staging Table, Task Summary, WatchListLinkTable Overwrite
Cost Item Don't Change
Role Import
Calendar My Project Tasks Overwrite
Counters Action Item ID, Benefit Item ID, Budget Item ID, Demand, Issue, Operational ID, Portfolio, PPM Project Calendar, Program, Project, Resource Plan ID, Risk, Strategic Objective Overwrite
Dashboards Demand Management, My Portfolio Details, My Projects, My Work - Alt IT, Overview PPM, Program Details, Project Details, Resource Management - Individual, Resource Management - Role Overwrite
Fields 1st Quarter, 1st Quarter Remaining, 2nd Quarter, 2nd Quarter Remaining, 3rd Quarter, 3rd Quarter Remaining, 4th Quarter, 4th Quarter Remaining, 5th Quarter, 5th Quarter Remaining, 6th Quarter, 6th Quarter Remaining, 7th Quarter, 7th Quarter Remaining, 8th Quarter, 8th Quarter Remaining, 9th Quarter, 9th Quarter Remaining, 10th Quarter, 10th Quarter Remaining, 11th Quarter, 11th Quarter Remaining, 12th Quarter, 12th Quarter Remaining, Action, Action Comments, Action Plan, Actual Effort, Actual End Date, Actual Hours, Actual Start Date, Allocated Hours Per Day, Alt 1 Command, Alt 1 Command Name, Alt 1 Next Status, Alt 1 Next Status Text, Alt 1 Status, Alt 1 Status Text, Alt 2 Command, Alt 2 Command Name, Alt 2 Status, Alt 2 Status Text, Alt Status, Approval Block ID, Approved, Area, Asset Management, Assigned Role, Assignments, Available Hours, Available Project Hours, Baseline End Date, Baseline Start Date, Benefit If Done, Benefit Item ID, Booking Type, Budget, Budget Cost, Budget End Date, Budget Health, Budget Health Score, Budget Item ID, Budget Start Date, Budget Term End Date, Budget Term Start Date, BudgetChangeDetails, BudgetChangeNo, BudgetChangeYes, Business Driver, Business Objective, Business Reason, Business Value Score, CapEx Budget, Capital Expenses, Capital items, Change Order Title, ChildID, ChildJoinReason, ChildType, Closed Date, Committee Approval Required, Completed Projects, Cost, Cost Item Type ID, Cost Item Type Name, Cost Type, Counter, Create New Records, Created By, Created By ID, Created Culture, Created Date Time, Customer Accepted, Customer Display Name, Customer ID, Customer Type ID, Daily Hours, Date, Date Completed, Date Of Decision, Date Opened, Delete record, Delete Resource, Demand Estimated Revenue, Demand ID, Demand ROI, Demand Score, Demand Size, Demand Sponsor, Demand Sponsor Email, Department, Dependencies, Description, Details, Disposition, Driver, Duration, Duration (Hours), Duration (In Days), Edit Via Browser, Effort, Effort (hours), Effort at Risk, Email, Employment Type, End Date, End Date Changed, Estimated Additional Effort, Estimated Capital Expenses, Estimated Cost, Estimated Effort, Estimated Operating Expenses, Estimated Remaining Effort, Estimated Revenue, Estimated Total Cost, Executive Approval, Expected Resolution Date, Facilities, File to Import, Financial Plan, Financial Score, Financial Score New, Focus Area, Friday, Full Name, Group Name, Health Issue, Health Type, Hours, Hours Per Day, Hours Per Week, Hours Worked, HR, Identified as a Risk, Impact, Impact Comments, Impact If Deferred, Impact on other initiatives, Impact To Scope, Initiated By, Issue Description, Issue ID, Issue Name, Issues, IT, ITPT Project ID, JoinReason, Last Mod Time Stamp, Last Modified By, Last Modified By ID, Last Modified Date Time, LastModTimeStamp, Linked Budget Item ID, Lock Summary, Locked, Manager, Monday, MS Project Milestone, MS Project Outline Number, MS Project Parent Outline Number, MS Project UID, MSProject Milestone, Name, New Projects, Next Status, Next Status Command, Next Status Command Name, Next Status One-Step, Next Status Text, No One Step, Notes, Objective, Old End Date, Old Start Date, Open Date, Operating Expense items, Operating Expenses, Operational Hours, Operational Hours per Day, Operational Hours per Week, Operational Percent, Operational Task, Operational Task ID, Operational Task Name, Operational Task RecID, Operational Tasks, OperationalTask Type ID, OperationalTask Type Name, OpEx Budget, Original Total, Other, Overall Score, Owned By, Owned By Email, Owned By ID, Owned By Manager, Owned By Manager Email, Owned By Manager ID, Owned By Manager Phone, Owned By Phone, Owned By Team, Owned By Team ID, Parent ID, Parent RecID, ParentID, ParentType, ParentType, Percent Complete, Percent of Demand, Percent of demand Unshown, Percentage, Phone, Planned Effort, Planned End Date, Planned Remaining Effort, Planned Start Date, Plans Type ID, Plans Type Name, Portfolio, Portfolio Approved, Portfolio Budget, Portfolio Flag, Portfolio ID, Portfolio Manager, Portfolio Manager Email, Portfolio Manager ID, Portfolio Name, Portfolio ROI, PPM Action Item ID, PPM Decision ID, PPM Group, PPM Health Type ID, PPM Portfolio ID, PPM Program ID, PPM Project ID, PPM Project RecID, PPM Resource ID, PPM Resource Plan ID, PPM Resource Time ID, PPM Risk ID, PPM Scope ID, PPM Stakeholder ID, PPM Status Groups ID, PPM Status ID, PPM Strategic Objectives ID, PPM Timesheet ID, Pred Task Type 1, Pred Task Type 2, Pred Task Type 3, Predecessor 1, Predecessor 1 Name, Predecessor 1 RecID, Predecessor 2, Predecessor 2 Name, Predecessor 2 RecID, Predecessor 3, Predecessor 3 Name, Predecessor 3 RecID, , Predecessor UID 1, Predecessor UID 2, Predecessor UID 3, Predecessor XML Parsing, Predecessor XML Parsing 2, Predecessor XML Parsing 3, Primary Stakeholder, Primary Strategic Objective, Priority, Probability, Probability score, Probability Weight, Process, Program, Program Budget, Program ID, Program Manager, Program Manager Email, Program Manager ID, Program Name, Project, Project Approval, Project Estimated Hours, Project Health Update, Project ID, Project Manager, Project Task ID, Project Task Records for Import, Project Tasks, PTO, PTO Hours, Quarter, RecID, Record Saved, Rejected, Remaining Availability, Remaining budget, Remaining Effort, Requested By, Requested By Team, Requested Completion Date, Requested Start Date, Required By, Resolution, Resource, Resource ID, Resource Percentage, Resource Plan ID, Resource Score, Resources, Risk, Risk Score, Risk Score Weight, Risks, ROI, Role, Role ID, Saturday, Schedule Health, Schedule Health Score, ScheduleChangeDetails, ScheduleChangeNo, ScheduleChangeYes, Scheduled End Date, Scheduled Start Date, Scope, Scope Change Yes, Scope Health, Scope Health Score, ScopeChangeDetails, ScopeChangeNo, Score, Score Calculated, Score Resource, Security, Selected Status, Site, Skill(s), Softbook Hours Per Day, Softbooked Resources, Sponsor, Sponsor ID, Stakeholder, Start Date, Start Date Changed, Status, Status Order, Strategic Objective, Strategic Objectives ID, Subject, Submitted, Submitted Via Browser, Sunday, Target Date, Task, Task Number, Task Title, Task Type, temp_status_set, Thursday, Timesheet ID, Title, Total, Total Budget, Total Budget Committed, Total Budget Remaining, Total Closed Budgets, Total Cost, Total Effort, Total Hours, Total hours for Demand, Total Open Budgets, Total Return, Total Revenue, T-Shirt Size, Tuesday, Type, Update Ran, Updated Via Import, Updated via Parent, Updating Tasks, Updating Tasks Completed, User Info RecId, Valid, Valid Approver, Value Description, Wednesday, Week Of, Weekly Hours, Weekly Total, Weighting, Work Week Hours, Year 1, Year 1 Benefit, Year 1 Budget, Year 1 Cost, Year 1 Remaining, Year 2, Year 2 Benefit, Year 2 Budget, Year 2 Cost, Year 2 Remaining, Year 3, Year 3 Benefit, Year 3 Budget, Year 3 Cost, Year 3 Remaining Overwrite
Forms ActionItem, BenefitPlan, BudgetItem-ProjectForm, CostEntry, CostItemEntry, Demand, Demand Financial Assessment, Demand Overview, Issue, ITPTArea, OperationalTaskStatus, OperationalTaskType, Portfolio, Portfolio Overview, PPM Program Overview, PPM ProjectTask Overview, PPMChangeOrder, PPMDecision, PPMDemand Risk, PPMDemand Summary, PPMFocusArea, PPMHealthType, PPMPortfolio Summary, PPMPredecessorType, PPMProgram Summary, PPMProject, PPMResourceTime, PPMScope, PPMStakeholder, PPMStatus, PPMStatusGroup, PPMStrategicObjectives Summary, PPMTasks, PPMTimesheet Overview, PPMType, Program, Project Header, ProjectSummary, ProjectTaskSupportingTable Overwrite
Form Arrangements PPMDemand, PPMPortfolio, PPMProgram, PPMResourcePlan, PPMResourceTime, PPMStrategicObjectives, PPMTask, PPMTimesheet, Project, ProjectTaskStagingTable, Resource, TaskSummary Overwrite
Grids ActionItem, BenefitPlan, CostEntry-Grid, CostItemEntry, Demand, Issue, ITPTArea, ITPTDemandRisk, ITPTFocusArea, ITPTPredecessorType, ITPTStakeholder, ITPTType, OperationalTask, OperationalTaskStatus, OperationalTaskType, Plans, Portfolio, PPMActionItem1, PPMChangeOrderGrid, PPMDecision, PPMDemand Dashboard, PPMHealthType, PPMPortfolio Dashboard, PPMProject Dashboard, PPMProject-Simple, PPMResourceTime, PPMRisk1, PPMScope, PPMStakeholder-2, PPMStatus, PPMStatusGroup, PPMStrategicObjectives-Grid, PPMStrategicObjectives-Portfolio, PPMTasks, Program, Proj Details Dashboard Grid, Project, ProjectTask for Project, ProjectTaskSupportingTable, Resource, ResourcePlan, Role, ScheduledPTO, StrategicObjectives, TaskSummary, Timesheet, Timesheet Dashboard, WatchListLinkTable Overwrite
Image Definitions Demand100x100, Demand-Icon, DemandNew100x100, Exec-Icon, Home-Icon, Milestone100x100, My-Portfolio-Icon, My-Projects-Icon, My-Work-Icon, Operational Task Icon100x100, Portfolio100x100, PPM-Double-Arrows, Program100x100, Program-Details-Icon, Project Task100x100, Project100x100, Project-Details-Icon, PTO100x100, Resource Plan100x100, Resource100x100, Resources-Icon, Role100x100, Role-Icon, Role-Icon-100x100, Strategic Objectives100x100, Task Summary100x100, Timesheet100x100, White Arrow Overwrite
Indexes BenefitItem_BenefitItemID, Demand_DemandID, Issue_IssueID, OperationalTask_OperationalTaskID, PK_ActionItem, PK_CostItem, PK_Demand, PK_Issue, PK_ITPTArea, PK_ITPTFocusArea, PK_ITPTPredecessorType, PK_ITPTType, PK_OperationalTask, PK_OperationalTaskStatus, PK_OperationalTaskType, PK_Plans, PK_Portfolio, PK_PPMDecision, PK_PPMHealthType, PK_PPMResourceTime, PK_PPMScope, PK_PPMStakeholder, PK_PPMStatus, PK_PPMStatusGroup, PK_PredecessorLinksSuccessor, PK_Program, PK_ProjectTaskSupportingTable, PK_Resource, PK_ResourcePlan, PK_Role, PK_ScheduledPTO, PK_StrategicObjectives, PK_Timesheet, PK_WatchListLinkTable, Portfolio_PortfolioID, PPMActionItem_PPMActionItemID, PPMChangeOrderIdx0, PPMDecision_PPMDecisionID, PPMHealthType_PPMHealthTypeID, PPMProgram_PPMProgramID, PPMProjectIdx0, PPMProjectIdx1, PPMResourceTime_PPMResourceTimeID, PPMRiskIdx0, PPMScope_PPMScopeID, PPMStakeholder_PPMStakeholderID, PPMStatus_PPMStatusID, PPMStatusGroup_PPMStatusGroupsID, PredecessorLinksSuccessorIdx0, ProjectTaskStagingTable_Title, Resource_FullName, ResourcePlan_ResourcePlanID, Role_Role, RoleIdx0, StrategicObjectives_StrategicObjectivesID, Timesheet_TimesheetID Overwrite
Mergeable Area Budget Item Actions, Cost Entry Actions, ITPT Project Actions, PPM Demand Actions, PPM Demand Approvals, PPM Resource Actions, PPM Resource Item Actions, PPM Resource Time Actions, PPM Timesheet Actions, Project Task Actions, Task Summary Actions Overwrite
One-Step™ Actions Accept Idea, Accept In Portfolio, Add Budget Items to Project, Add To Portfolio, Alt Step 1 from Relationship, Alt Step 2 from Relationship, Approval, Approval Denied, Approve, Assign a Project Manager, Assign a Role, Assign a Team, Assign an Individual, Assign an Initiator, Assign ID - delete me, Assign to a Project Manager, Assign to Individual, Assign to Me, Assign to Team, Automation - Update Successors Start Date change, Change Requester, Check Available Hours, Commit, Commit Hours to Task, Committee Approval, Committee Denied, Convert Demand to Service Request, Create Change, Create Committee Approval, Create Project from Demand, Create Project When Demand Approved, Create Weekly Timesheets, Date Time Information, Delete Old TimeSheets, Delete Resource, Delete Staging Table, Delete Tasks, Demand Approved, Edit, Edit entries, Edit Via Browser, Email Assigned To, Email Portfolio Manager, Email Program Manager, Email Project Requester, Export XML, Flag for Delete, Go to Calendar, Go to portfolio record, Go to Program record, Go to Project Record, Go to Record, Go to the Task, Import CSV Update to Staging Table, Import into staging table, Import New Project CSV, Import New Project XML, Import Project, Import Project from CSV, Import Project Tasks into Staging Table, Import Update to Staging Table, Link MS Project Predecessor, Link parent, Modify Demand, My Portfolio Dashboard Button, My Program Dashboard Button, My Project Dashboard Button, Need More Information, Next Status, Next Status Step, Next Step from Relationship, Open Task, Owner Email, Portfolio Approved, Portfolio Approved From Demand, Portfolio Approved From Project, Portfolio follow Up Email, Portfolio Manager Email, Predecessor 1, Predecessor 2, Predecessor 3, Project Approved, Refresh, Refresh Cost, Refresh Cost on Save, Reject Idea, Remove from Deferred, Remove From Portfolio, Requester Email, Requester Follow Up Email, Resource Daily Time Entries, Resource Management Individual Selector, Resource Management Individual Set View - Per Day, Resource Management Individual Set View - Per Week, Resource Management Individual Update Dates, Resource Management Update End Date, Resource Management Update Start Date, Resource Time Cleanup, Save, Select a task, Select a Team, Select an Individual, Select an Owner, Select Customer, Select Department, Select Employment Type, Select Name, Select Portfolio Manager, Select Requester, Select Resource Manager, Select Role, Send Project Health Update, Set Associated Task to In Progress, Set BaselineDates, Set Budget Health, Set Flag To Create New Records, Set Parent Outline Number, Set Planned Dates, Set Predecessor 2&3, Set Schedule Health, Set Scope Health, Set Status To Deferred, Set to Assigned, Set to Committed, Set View - Per Day, Set View - Per Week, Submit, Submit for approval, Submit For Review, Submit Hours to Weekly Time Sheet, Submit Via Browser, Take Ownership, uncheck, update, Update Available Hours, Update Budget, Update Budgets, Update Dashboard, Update Estimated Hours, Update Health, Update Hours, Update Parent Successor/Child End date, Update Parent Successor/Child Start Date, Update Parent Time Reporting, Update Percent, Update Project, Update Project from CSV, Update Project Tasks, Update Project Tasks Hours, Update pt, Update Resource, Update Resource Time Bookings, Update Resource Time Entries, Update Start/End Dates, Update Successor Start Date Change (Finish to Start Process), View Date Time Information Overwrite
Relationships Budget Item Owned By PPM Project, Budgets Links to Cost Entries, Cost Entry Links to Budgets, Cost Entry Owned By PPM Project, Demand Links Operational Tasks, Demand Links Program, Demand Owns Journals, Operational Task Links Demand, Operational Task Links Task Summaries, Operational Tasks Link Resources (PPM Softbook), PPM Action Item Owned By PPM Project, PPM Change Order Links Users, PPM Change Order Owned By PPM Project, PPM Decision Owned By PPM Project, PPM Demand Links Customer, PPM Demand Links PPM Portfolio, PPM Demand Links PPM Project, PPM Demand Links PPM Resource Plans, PPM Demand Links PPM Status, PPM Demand Links PPM Strategic Objectives, PPM Demand Links UserInfo, PPM Demand Owns Approvals, PPM Demand Owns Benefit Plans, PPM Demand Owns Budget Item, PPM Demand Owns PPM Demand Risks, PPM Demand Owns Stakeholders, PPM Demand Owns Stakeholders Committee Approval, PPM Issue Links UserInfo, PPM Portfolio Links Owned By, PPM Portfolio Links PPM Demands, PPM Portfolio Links PPM Projects, PPM Portfolio Links PPM Strategic Objectives-ManyToMany, PPM Portfolio Links User, PPM Portfolio Owns PPM Issues, PPM Portfolio Owns PPM Programs, PPM Portfolio Owns PPM Risks, PPM Program Links PPM Projects, PPM Program Links PPM Strategic Objectives, PPM Program Owned By PPM Portfolio, PPM Program Owns Journals, PPM Program Owns PPM Issues, PPM Program Owns UserInfo - Owned By, PPM Program Owns UserInfo - Program Manager, PPM Project Links Change Requests, PPM Project Links CustomerPPM Project Links Operational Tasks, PPM Project Links PPM Demand, PPM Project Links PPM Portfolio, PPM Project Links PPM Program, PPM Project Links PPM Resource Plans, PPM Project Links Project Tasks, PPM Project Links to Status, PPM Project Links to UserInfo, PPM Project Owns Benefit Plans, PPM Project Owns Budget Items, PPM Project Owns Cost Entry, PPM Project Owns Journals, PPM Project Owns PPM Action Items, PPM Project Owns PPM Change Orders, PPM Project Owns PPM Decisions, PPM Project Owns PPM Issues, PPM Project Owns Risks, PPM Resource Owns PPM Scheduled PTOs, PPM Resource Plan Links PPM Demand, PPM Resource Plan Links PPM Project, PPM Resource Time Owned By Resource, PPM Scheduled PTO Owned By PPM Resource, PPM Strategic Objectives Links PPM Portfolios, PPM Strategic Objectives Links PPM Programs, PPM Timesheet Links Task Summaries, Predecessor links Successor, Program Owned By Demands, Project Task Links PPM Project, Project Task Links Project Task - Parent, Project Task Links Project Tasks - Children, Project Task Links Resource Time, Project Task Links Task Summaries, Project Tasks owns Staging tasks, Resource Links PPM Tasks (Softbooking), Resource Owns Operational Tasks, Resource Owns PPM Resource Times, Resource Plan Links Project Tasks, Resource Plan Links Resource Plans, Resource Plans Links Resource Time, Resource Time Links Project Task - Allocated, Resource Time Links Project Task Softbook, Role Links Resource, Staging task owned by project tasks, Stakeholder Links UserInfo, Sucessor Links Predecessor, Task Summary Links Operational Task, Task Summary Links PPM Project, Task Summary Links PPM Timesheet, Task Summary Links ProjectTask, TimeSheet Links PTO Overwrite
PPM Demand Links Phase Set, PPM Portfolio Links Phases, PPM Project Links Milestones, PPM Project links Phase Set Import
Reports Demand vs Project, Demand vs Project Execution, PPM Project Snapshot, Weekly Resource Availability by Role Overwrite
Searches Active Projects, Active within Date Range for Report, All, All Demands, All Portfolios, All Programs, ALL Project Tasks, All Projects, All Projects Closed Calendar Year, ALL Resource Plans, All Resources, All staging records, All Task Summaries, Approved Demands, Awaiting Approval Demands, Calendar - Child Project Tasks, Calendar - Milestone Project Tasks, Calendar - Parent Project Tasks, Calendar - Project Tasks, Committed Projects within Program, Date Range and Role, Deferred Demands, Demand Matrix, Issues Type is Budget, Issues Type is Schedule, Issues Type is Scope, My Open Project Tasks, My Open Projects, My Project Tasks, My Resources, My Task Summaries, My Timesheets, New Demands, Open Demands, Open Portfolios, Owner Resource Times, Portfolio Budget Issues, Portfolio Schedule Issues, Portfolio Scope Issues, Program Issues Type is Schedule, Program Issues Type is Scope, Program Rec ID equals Stored Value, Project ID equals Stored ID, Project Task, Project Tasks Owned by My Team, Projects Not In Portfolio, Projects Open Portfolio, Projects Within Portfolio, Projects within Program, Resource Allocation Report, Resource Entries Greater Than Today, Resource Time aged 2 Weeks, Resource Time by Date Range, Resource Time by Role Dates, Resource Time Dashboard - Individual, Resource Time Dashboard - Role, Resource Time Owned By, Resources by Role, Selected Closed Project for Report, Selected Portfolio, Selected Project for Report, Submitted Timesheets, Task Summaries By Project, Tasks at Risk Overwrite
Stored Expressions # High Impact Open Risks, # of Open Issues, 1st Quarter, 2 Weeks Ago, 2nd Quarter, 2nd Quarter Remaining, 3rd Quarter, 3rd Quarter Remaining, 4th Quarter, 4th Quarter Remaining, 5th Quarter, 6th Quarter, 7th Quarter, 8th Quarter, 9th Quarter, 10th Quarter, 10th Quarter Remaining, 11th Quarter, 11th Quarter Remaining, 12th Quarter, Actions Visible Only in Assessing Status, Actual Start Date, All Open Projects, All Task Summaries, Automation Finish to Start, Budget Health Color Link, Budget Item ID, Budget Remaining, Business Value, CapEx Budget, Clear Approver, Clear Executive Approver, Copy of Hours per day, Cost Year 1, Cost Year 2, Date is Valid, Days per Task, Demand Score, Effort, End of the Week, Estimated Hours For Project, Financial, Finish to Start, High Impact Open Risks/Issues Trigger, Hours per Day, Hours per Week, Logical Field Projects at Risk, Next End of Year, OpEx Budget, Portfolio Budget Health, Portfolio Budget Remaining, Portfolio Schedule Score Value, Project ID, Project Name, Project Status, Read Only Background, Remaining Availability, Remaining Effort For Project, Remove Actions Visible Only in Assessing Status, Required Fields Review Idea, Resource Plan ID, risk score, Risk Total, Schedule Health Color Link, Scope Health Color Link, Set budget Health, Set Schedule Health, Set Scope Health, Softbooked Resource, Start Date, Start of the Week, Submitted Task Summaries, System State Email, System State E-mail, Tasks at Risk, test, Time, Total Budget, Total Budget Committed, Total Cap Expenses rollup, Total Closed Project Budgets, Total Cost, Total Hours, Total Labor, Total Op Expenses rollup, Total Open Project Budgets, Total Portfolio Budget Spent, Total Value, true, Weekly Total, Weeks Per Task, Year 3 Cost Overwrite
Stored Values Answer, Budget Health, Budget Issues, Calendar Project ID, Demand Approval Size, MS Project Outline ID, MS Project Pred UID, Parent End Date, Portfolio Budget Health, Portfolio Description, Portfolio ID, Portfolio RecID, Portfolio Schedule Health, Portfolio Scope Health, Portfolio Status, Portfolio Title, PPM Rec ID, Predecessor 1, Predecessor 2, Predecessor 3, Predecessor End Date, Predecessor RecID, Program Budget Health, Program Description, Program RecID, Program Schedule Health, Program Scope Health, Program Status, Program Title, Project Budget Health, Project Cost Score, Project Description, Project ID, Project RecID, Project Schedule Health, Project Scope Health, Project Status, Project Title, PTO End Date, PTO Start Date, Resource, Resource Dashboard - Chart View, Resource Dashboard End Date, Resource Dashboard Individual, Resource Dashboard Role, Resource Dashboard Start Date, Resource RecID, Resource Time Date, Role, Schedule Health, Schedule Issues, Scope Health, Scope Issues, Start Date Difference, Successor Count, Successor Count Child, Task RecID, Test First Of Year, Test Iterator, Working Hours Overwrite
Tabs Approvals, Action Items, Allocated, Benefit Plan, Benefit Plans, Budget Items, Budget Plan, Change Orders, Change Requests, Children Task(s), Cost Items, Decisions, Demand, Demands, Financial Assessment, Issues, Journals, Operational Tasks, Overview, Parent Task, Portfolio, PPM Demand, PPM Project, PPM Resource Plans, PPM Resource Time, PPM Resource Times, PPM Timesheet, Predecessor(s), Program, Programs, Project, Project Task, Project Task Import, Project Tasks, Projects, PTO, Resource Plan, Risks, Softbooked, Stakeholders, Strategic Objectives, Successor(s) Overwrite
Teams Project Management, Demand Management Overwrite
Widgets Active Demands - Projected Cost, Active Demands - Projected Revenue, Actual Project Cost, Actual Project Hours, All Portfolio Budgets, Approved Projected Revenue - Demand Management, Budget Issues, Budgeted Project Cost, Committed Project Budget, Committed Project Revenue, Dashboard Resources, Demand Projects, Demand Requests By Stage, Demands Awaiting Approval, Incidents and Requests Owned by Me, My Incident Tickets, My Open Project Tasks, My Open Projects - Details, My Open Timesheet Count, My Operational Tasks, My Operational Tasks - Detail, My Priority 1 Incident Tickets, My Priority 1 Service Requests, My Project Effort, My Project Task Details, My Project Timesheets, My Projects by Status, My Projects Cost, My Teams Change Requests - Count, My Teams Open Incidents and Request, My Teams Operational Tasks, My Teams Problems - Count, My Total Service Requests, My VIP Incident Tickets, My VIP Service Requests, Number Of Resources, Open Portfolios, Planned Project Hours, Portfolio Health Matrix, Portfolio Project Health Matrix, Potential Costs - Demands, Potential Revenue - Demands, Program Budget Issues, Program Cost by Project, Program IssuesType is Scope, Program Project Budget, Program Project Health Matrix, Program Resources by Project, Program Revenue, Program Schedule Issue, Program Total Budget, Program Total Cost, Project Cost within Portfolio, Project Effort within Portfolio,Project Health Matrix, Project Issues Total, Project Risks Total, Project Tasks, Projected Remaining Project Hours, Projected Revenue - Demand Management, Projects for Consideration Budget, Projects for Consideration Revenue, Projects Not In Portfolio, Projects Within Portfolio, Projects within Program, Remaining Budget, Resource Bar - Daily (Individual), Resource Bar - Daily (Role), Resource Bar - Weekly (Individual), Resource Bar - Weekly (Role), Schedule Issues, Scope Issues, Scoring Matrix - Demand Management, Tasks at Risk - Total, Tasks Behind Schedule, Tasks Starting This Week, Timesheets Awaiting Approval - Grid, Total Budget of Portfolio, Total Committed Budgets, Total Cost of All Portfolios, Total Cost of Portfolio, Total Expected Revenue, Total Revenue Overwrite
  • Import: Add new item.
  • Overwrite: Replace target item.
  • Merge: Merge differences.
  • Don't Change: Referenced by the mApp Solution, but not altered in any way. The mApp Solution includes the definition for informational purposes only (the definition is not imported into the target system).

Was this article useful?