Create RFC for Variance Action
•About the Create RFC for Variance Action
•Graphical Action Designer: Create a Request for Change (RFC) for Variance Quick Action
About the Create RFC for Variance Action
The Create RFC for Variance action creates a Change business object (request for change) for a variance. For example, when the RAM size changes from the baseline to another value, it varies from the baseline. This action creates a Change business object for that variance and links between the business objects as needed.
Parameters
Parameter | Description |
---|---|
Enter action name | A unique name for the action. |
Enter action description | Optional. A description of what the action does. |
Enter category | Optional. The category. Select from the drop-down list. |
Field Name |
The field name. Select from the drop-down list. |
Field Value |
The field value. |
Actions
Button | Action |
---|---|
![]() |
Adds a field to the list. |
![]() |
Removes a field from the list. To delete a field in the Graphical Action Designer, click "X"at the top right of the Field Name entry in the Block section of Settings. |
Save | Commits your settings. |
Cancel | Exits without saving. |