PPM Risks

PPM Risks include budget uncertainty, potential resource problems, or aging technology. Create Risks during the Demand evaluation.

To create a PPM Risk:

  1. In the Risks tab, select New PPM Risk.
  2. Enter a name in the Risk field, and then select a type (optional).
  3. (Optional) Assign an impact (0 to -5) and probability (10 to 90%).
    This feeds the Demand Scoring widget.
  4. (Optional) Provide a description.
  5. Select Save.